Construction steps for granite floor tiles

Jun 25, 2025 Leave a message

The following are the construction steps for granite floor tiles, combining the latest construction technology and processes:
1. Preparation before construction
Clean the base: clean up the debris, dust, floating dust, etc. on the ground base to ensure that the ground is clean.
Check the base: carefully check the flatness, strength and humidity of the ground to ensure that the base is solid, flat, without cracks and looseness.
Design plan: Determine the paving plan according to the size, shape and design requirements of the construction area, including the arrangement of bricks, the size of gaps, etc.
Material preparation: Prepare granite floor tiles, cement, sand, water and other materials to ensure that the material quality meets the requirements.
2. Construction steps
Line and positioning:
According to the design plan, pop up horizontal, vertical, grid and block control lines on the ground.
Determine the baseline to ensure the overall horizontality and verticality of the paving.
Base treatment:
Sprinkle water on the base to moisten it, but without clear water, to enhance the bonding strength.G603 grey granite slab installation 2
Apply plain cement slurry or interface binder to the base, and lay the bonding layer as you brush.
Laying the bonding layer: Laying dry hard cement mortar (cement to sand volume ratio should be 1:2~1:3), spreading flat, compacting, thickness determined according to the design elevation. Laying granite floor tiles: Use a toothed trowel to evenly apply modified cement-based adhesive on the back of the granite floor tiles, with the thickness in the middle slightly higher than the surrounding area. Laying the floor tiles according to the position of the elastic line, tapping with a rubber hammer to ensure that the tile surface is flat, firm, and the tile joints are uniform. Filling and rubbing the joints: When the granite floor tiles are strong enough to be walked on (the compressive strength of the bonding layer reaches 1.2MPa), fill the joints. Use cement paste or special grout of the same type, strength grade, and color for grouting. The joints must be clear, straight, flat, and smooth, and the color of the joints must be consistent with the color of the stone. Maintenance: After paving, the ground should be closed for maintenance to avoid trampling and heavy rolling. The maintenance time should be no less than 7 days. 3. Precautions
Brick surface protection: During the construction process, the stains on the brick surface should be cleaned in time, and the protective film can be covered after the paving is completed.
Drainage slope: The drainage slope should be considered when paving the ground to ensure smooth water flow and avoid water accumulation.
Quality inspection: After paving, check whether the brick surface is flat, whether there are hollows, and whether the brick joints are uniform and neat.
Through the above steps, the construction quality of granite floor tiles can be ensured to create a beautiful and durable floor effect.